Allt Hallater, Allt Cloiche Finne and Allt nan Clach Sgoilte hydros

Published: 22nd November 2018

Read what the Trust has said in response to proposals for further hydro schemes in the Loch Etive area.

The Trust has made a conditional objection to the proposed construction by Green Highland Renewables  of the Allt Hallater Hydro Scheme in Glen Kinglass and a scheme on land north and east Of Glenkinglass Lodge taking water from the Allt Cloiche Finne and the Allt nan Clach Sgoilte. The sites are within Wild Land Area (WLA) 9 Loch Etive Mountains.

Read our comments in the downloads below.

Downloads